Addnewsletters@thegazette.comto your contacts. Project Overview:The construction update includes approximately 53,620 CY of earthwork, 16,564 SY of concrete paving, 7,045 SY of concrete shared use path, 986 SY of concrete driveway, 4,229 LF of storm sewer, 4,549 LF of subdrain, 4,634 LF of water main, drainage structures, 144 LF pedestrian tunnel, traffic control, pavement markings, erosion control, and other associated work. The Southwest Region consists of Columbia, Crawford, Dane, Dodge, Grant, Green, Iowa, Jefferson, Juneau, La Crosse . The program was created in 1987 for the purpose of increasing traffic safety on all of Iowas roadways. Cramer & Associates of Grimes is the primary contractor on the $10.3 million project. This project will consist of tree cleraring, grading, installing multiple box culvers, installing riprap to protec the creek, and site restoration. For more information, contact: Stuart Anderson at 515-239-1661 or stuart.anderson@iowadot.us, Posted by Iowa DOT at 01:15:19 PM The program is posted on the Iowa DOTs website https://iowadot.gov/program_management/Five-Year-Program. in Public Meetings, Statewide Interest, Transportation Commission. 2023-2027 Five Year Highway Program: description: This map displays the highway section of the Iowa Department of Transportation's Iowa Transportation Improvement Program. The new playground will include new inclusive play equipment, poured-in-place rubber & synthetic turf surfacing, new sidewalks, seat walls, benches, site amenities, and landscaping. The Commission is currently scheduled to consider approval of the Program at its meeting to be held on June 14. Project Eastern Region - Bridge Deck Preventative Preservation - Patching - Complete August 2022 Timeline: May 2022 - August 2022 Road Completed Adams County Lincoln County Stevens County Whitman County Franklin County Mailing a request for information to: Emily Geralds, Location and Environment Bureau, Iowa Department of Transportation, 800 Lincoln Way, Ames, Iowa 50010. This work will occur in April. Project Overview:Paving of approximately 715' of 76th St between Aspen Dr and Ashworth Rd including 2,915 CY of excavation, 2,560 SY of 7-inch thick reinforced PCC pavement, 3,040 SY of both subgrade preparation and 6-inch thick modified subbase, 1,215 LF of 6-inch subdrain, 340 LF of 15-inch RCP, 5 storm sewer structures, 775 LF of water main with assorted fittings, 1,375 LF of 7-way duct bank for fiber optic cable, 1,575 LF of conduit for fiber optic cable, 3 fiber optic cable vaults, and other miscellaneous associated work. Through traffic on Iowa 2 will be detoured using U.S. 275 and I-29 to the south through the town of Hamburg. 4200 Mills Civic Parkway, Suite 1B P.O. Okoboji, IA (KICD)- The Iowa Department of Transportation revealed some its plans for the Highway 71 project through the Iowa Great Lakes Area Tuesday evening. This funding is available for use on city, county, or state roads through an annual application process. Project Overview:The project will include construction of Booneville Road Bridge over Johnson Creek. This draft Program invests in projects that add capacity where necessary, replace major river crossings, and modernize interchanges to improve safety and to handle future traffic demands such as: Projects in this Program that address safety and operational needs include: The Infrastructure Investment and Jobs Act (IIJA) was signed into law providing certainty of federal highway funding for most of the period covered by this 2023-2027 Program and resulted in approximately 30 percent more highway-related funding by increasing funding for existing programs and also creating new programs. This assures the projects are those necessary to provide modern, safe, and efficient transportation of goods and the traveling public. The bridge was built by the Iowa Bridge Co. of Des Moines for $532,708 about $835,000 in today's dollars. The Sioux City Metropolitan Statistical Area ( MSA ) , also known as the Siouxland tri - state region , retained the nation's top spot for economic development for populations under 200 , 000 for the fourth year in a row according to results released today by Site Selection magazine in their 2022 annual rankings . Neuhaus said the top of the bridge will be the same elevation as the old bridge but the bottom will be a couple of feet higher. Project Overview: The City of West Des Moines (WDM), in conjunction with the Iowa Department of Transportation (Iowa DOT), will construct a series of stormwater detention basins within the Iowa DOT Right-of-Way on the north side of I-235 between Valley West Drive and 22nd Street to better manage stormwater during peak rainfall events and reduce flooding downstream. KNOW WHAT YOU'RE LOOKING FOR? The access to the Pohlman Prairie Preserve will also be closed while the adjacent portion of Iowa 3 is reconstructed. Roadway paving should occur in the spring with the roadway being open by Memorial Day weekend. Share & Bookmark, Press Enter to show all options, press Tab go to next option. The Program documents investments in Iowa's multimodal transportation system covering aviation, public transit, railroads, trails, and highways. Name: 2022 Street Repair Project (Asphalt) Area: S 24-S 28th near 14th Ave S, Fox Ridge/Fountain Circle, Ave M West Description: Mill and overlay section of streets with some sidewalk, curb and gutter replacement Starting: Spring 2022 Expected Completion: Spring 2023 Engineering Firm: City Engineer's Office Contractor: Fort Dodge Asphalt The reconstruction project is scheduled to begin in late Fall 2022 and run through the following year while crews avoid the bulk of the work during the peak tourist seasons. The improvements to generally include DEMOLITION. In addition, one existing programmed FY 2022 pavement project will be reduced in cost due to an updated project cost estimate. In order to put this funding to work quickly across the state, the Commission approved this amendment to add projects to fiscal year 2022. Iowa Department of Transportation. If possible, the concrete will be sent to a crusher and reused on another project, he said. # For more information, contact: Stuart Anderson at 515-239-1661 or stuart.anderson@iowadot.us Affected driveway approaches will be replaced and sidewalk curb ramps will be modified to be ADA compliant. This webpage lists highway projects in design and study for the Wisconsin Department of Transportation (WisDOT), Division of Transportation System Development (DTSD) Southwest Region. Project Overview: This project will be a complete reconstruction of 8th Street from I-235 to Clegg Road. 2/6/2006: Other The 8th Street intersection will be closed for a weekend starting on a Friday evening and reopening on Monday by 6am. Mount Vernon Mayor Jamie Hampton said the projects along Highway 30 have been a long time coming, though the construction can be a little frustrating for residents, many of whom commute to jobs in Cedar Rapids. The proposed roadway reconstruction project will improve drainage and slope stabilization along the roadway as well as the Heritage Trail and Pohlman Prairie Preserve. Sometimes, communication between state projects and communities isnt always the best for when they start or how long they are going to last. The current bridge was eligible for nomination to the National Register of Historic Places, according to the Iowa DOTs website, because its an early example of the welded I-girder bridge and was the first of its type to be built in Iowa. Anticipate fields to be available for play in Summer of 2023. Trails will consist of approximately 0.6-mile trailloop suitable for beginner/novice users (green loop on singletrack trails plan) and a1-mile trail loop suitable for intermediate users (blue loop). Bridge construction will beign in February 2023. In that vein, the program includes more than $1.2 billion for Iowas state-owned bridges and more than $2.8 billion is set aside for the modernization of the highway system. Letter, For assistance accessing public files, contact pfhelp@spencerradiogroup.com |, Advisory Public Notice - Non-Discriminatory Ad Contracts. The program was created in 1987 for the purpose of increasing traffic safety on all of Iowas roadways. Keep reading for all the details. Contractor: Caliber Concrete LLC Last Updated: June 2022. type: Web Map: tags: Anticipate trail opening later in the week of 12/5. These changes add approximately $50.9 million of construction work to the FY 2022 program year. Project Status: Site has been fenced off and demo work is currently taking place. Updated for the April 2022 letting. Iowa DOT is currently soliciting or recently completed. A list of the project changes for the highway section of the program can be viewed at: https://iowadot.gov/program_management/five-year-program. This draft Program includes more than $1.3 billion of additional bridge investments. The roadway paving will occur spring 2023 and the roadway is anticipated to be open to traffic by fall 2023. The Program is developed and approved annually by the Commission and includes specific highway and bridge projects anticipated to be constructed over the next five years on the state highway system made up of all Interstate, U.S., and Iowa signed routes. document.getElementById( "ak_js_2" ).setAttribute( "value", ( new Date() ).getTime() ); Your email address will not be published. Obviously, theres work that needs to be done and that will create inconveniences, we are used to the major construction projects and people will adapt, he said. The Iowa DOT's transportation research achievements are a result of numerous collaborations between Iowa DOT research staff, university researchers, technical experts, local system engineers, and industry partners. This funding is available for use on city, county, or state roads through an annual application process. Stage 2 will include the area of 8th Street south of Office Park Road to just north of Clegg Road. Iowa Secondary Road and Bridge Projects Planned for 2022-2026. Construction began in November 1951 and was open to traffic Nov. 10, 1953. Go Back AMES, Iowa - July 18, 2022 - The Iowa Department of Transportation is requesting public input for three proposed bridge replacement projects on Iowa 2 east of I-29. The program is posted on the Iowa DOTs website, I-80 Middle Road Interchange reconstruction in Bettendorf, I-35/80/235 Southwest Mixmaster modernization in Polk County, I-380 improvement from 120th St to U.S. 30 (including Wright Brothers interchange reconstruction) in Linn County, Bridge replacement and widening of I-35 at the U.S. 30 interchange, Acceleration and compression of the I-80 and Madison Avenue improvement project in Council Bluffs which had to be delayed last year due to funding constraints. 8, 2020 Today, the Iowa Transportation Commission approved $7,506,000 in total funding for 26 separate projects from Iowas Traffic Safety Improvement Program. Storm Lake Police Asking For Help Locating Runaway Teen, Four Charged in Two Emmet County Traffic Stops, February Ends As Typical Up and Down Month, Area Lawmakers Discuss Replacing Tax Revenue No Longer Drawn from Pensions, Non-Discriminatory Advertising The map below shows project locations for FY 2022 Traffic Safety Improvement Program. Project Status:Contractor is substantially complete including site restoration. (Rebecca F. Miller/The Gazette), Traffic moves Sept. 10 along Highway 30 over the Cedar River outside Cedar Rapids. A historic bridge spanning the Cedar River along Highway 30 between Cedar Rapids and Mount Vernon will be torn down and replaced next year. 2022: Self-Heating Electrically Conductive Concrete Demonstration Project Project Overview: The project involves removing and reconstructing 8th Street from Hillside Avenue to Vine Street, and Vine Street at the intersections of 16th Street and 14th Street. Box 65320 West Des Moines, Iowa 50265 Phone: 515-222-3444 Email: ParkRec@wdm.iowa.gov 2022 PLAYGROUND REPLACEMENT PROJECT HOLIDAY PARK YOUTH BASEBALL FIELD 3 AND 4 IMPROVEMENTS 2021 CONCRETE TRAIL RENOVATION PROJECT VALLEY VIEW PARK PICKLEBALL COURTS AND ANCILLARY IMPROVEMENTS Contractor: MNM Concrete Project Status:All asphalt work has been completed and they are working on replacing intake and manhole boxouts at various locations within the project. Farm to Market. Iowa Weird: That Time The X-Files Did A Northwest Iowa Episode. The working days arent always easy to quantify because if it storms or if the river is high, that doesnt count as a working day, Neuhaus said. Estimated Completion: Summer 2023 Also follow us on Facebook and Twitter. AMES, Iowa January 25, 2022 The Iowa Department of Transportation is proposing to reconstruct Iowa 3, from just south of County Road C9Y in Sageville to 0.7 mile north of Boy Scout Road, in Dubuque County. The Iowa Department of Transportation (Iowa DOT) is requesting a technical proposal from consultant engineering/planning firms concerning their qualifications, experience and availability to complete Phase I of a two-phase process that will deliver a fully operational Statewide Travel Demand Model for the State of Iowa. The reconstruction project is scheduled to begin in late Fall 2022 and run through the following year while crews avoid the bulk of the work during the peak tourist seasons. The scope of the project includes constructing two new bridges over I-80 and removing the existing bridge. Comments may be submitted through the online comment form at: www.bit.ly/iowadot4666, Posted by Iowa DOT at 08:00:00 AM in Public Meetings, Statewide Interest. The draft Program documents investments in Iowas multimodal transportation system covering aviation, public transit, railroads, trails, and highways. All rights reserved. American Legion Park: Restoration of the site has been completed and the parking lot is open for use. IIJA has allowed additional projects to be included in our Program. (Rebecca F. Miller/The Gazette). River traffic is also requested to keep out of the area due to the hazards of the construction, he said. Project Status: The contractor is constructing the bridge over Sugar Creek. In addition, the portion of the Heritage Trail that parallels Iowa 3, from Clay Hill Road to Burton Furnace Road, will be temporarily closed during construction of the project. Project Overview:The project includes the construction of PCC pavement, related storm sewer, sanitary sewer, water main, subdrain, earthwork, channel excavation, and SWPPP controls generally located west of the future intersection of South Grand Prairie parkway and Grand Avenue. The Iowa Transportation Commission this week approved the next 5 year plan (2022-2026) which includes an estimated $30 million for projects in Cherokee County. Iowa Department of Transportation. As it stands now, the state plans to recycle pieces of the bridge, with the metal going to a scrap yard. A list of the project changes for the highway section of the program can be viewed at: For more information, contact: Stuart Anderson at 515-239-1661 or, https://iowadot.gov/program_management/five-year-program. Detailed information on each of the research and development projects mentioned in this report is available from the Research and Analytics Bureau, Transportation Development Division, Iowa Department of Transportation Each year, IDOT manages hundreds of projects that will positively impact the motoring public by improving travel times, decreasing congestion, enhancing safety, creating jobs and strengthening area economies by supplying new or improved travel options. The span, first of its kind in Iowa, will be torn down in April. Project Overview:The project will include approximately 290 Linear Feet (LF) PCC curb and gutter replacement, 100 Square Yards (SY) of 7" Reinforced PCC Full Depth Patching, 3,820 SY of 9" Reinforced PCC Full Depth Patching, 2,270 SY of 10" Reinforced PCC Full Depth Patching, Intake Reconstruction, Manhole Adjustments, Sidewalk Reconstruction, Traffic Control, and other miscellaneous work within the City of West Des Moines, IA. Sending an email request for information to: emily.geralds@iowadot.us. You can contribute to us here. During construction times there will be some detours on Highways 9 and 86 will be utilized with access still be allowed for local residents and businesses. You will begin to receive ourDaily News updates. Project Overview:Construct South Grand Prairie Parkway from Raccoon river to Grand Avenue including all materials, labor, and equipment necessary for installation of approximately: 4,351 LF of storm sewer with 38 structures, 328,089 CY of grading, 8 acres of grubbing, 27,316 SY of PCC pavement, 441'x42' pretensioned prestressed concrete beam bridge, 85 LF reinforced concrete box culvert, 22 acres of surface restoration, erosion control including 7,866 ton of riprap, macadam stone, and erosion stone, joint utility trench, pavement markings, traffic control, and miscellaneous related work and appurtenances. Construction is scheduled to take 120 working days, with completion expected by Nov. 11, 2022. Stage 2 will be completed and reopened to traffic as Stage 3 is started. This five-year program documents $3.6 billion of highway and bridge construction projects on the primary road system using federal and state funding. City staff currently performing selective tree removals. This five-year program documents $3.6 billion of highway and bridge construction projects on the primary road system using federal and state funding. These lines are not part of the Iowa One Call system and are often in direct conflict with the necessary work and are unavoidable. According to the White House, Iowa will receive about $5 billion overall, with $3.4 billion for highways and $432 million for bridge replacement and repairs. Estimated Completion:Fall 2022 The work will consist of milling off the existing asphalt and paving new asphalt. All other roads in the state are under the jurisdiction of individual cities and counties and each local jurisdiction develops their own program of highway, road, street, and bridge construction projects. 4200 Mills Civic Parkway This document describes planned investments in Iowa's multimodal transportation system including aviation, transit, railroad, trails, and highways. Project Status:The segment of Grand Prairie Parkway from Stagecoach Drive to Booneville Road is open to traffic. Project Status: The project is out for bid and should be awarded in early March. City Hall Please enable JavaScript in your browser for a better user experience. Project Status:Project is substantially complete. There will be asphalt resurfacing work in the intersection of 8th/Center Street requiring a road closure. However, a significant portion of the additional revenue had to be allocated to already scheduled projects just to offset the large increase in material and fuel costs due to the level inflation being experienced across the country. These changes add approximately $50.9 million of construction work to the FY 2022 program year. Project Status:The contractor hascompleted the jug handle construction and will resume grading spring 2023. Select the type of notification and the method (email or text message) desired for the specific construction projects that interest you. Project Status:SE County Line Road has reopened to traffic. The interstate system connects all transportation systems in Iowa and facilitates the efficient movement of freight within, to/from, and through Iowa. The roadway paving should be complete and opoen to traffic by summer 2023. The $28 million bypass widened 8 miles of highway from west of Mount Vernon (at Wilcox Road) to east of Lisbon (at Charles Avenue). KNOW WHAT YOU'RE LOOKING FOR? Local funds. KNOW WHAT YOU'RE LOOKING FOR? Number of projects. According to the White House, Iowa will receive about $5 billion overall, with $3.4 billion for highways and $432 million for bridge replacement and repairs. The contractor will be responsible for turf restoration for the areas that are disturbed. Project Status:The contractor is grading and installing undergound utilities. TRY OUR A-Z INDEX. During this time, there will be disruptions of access to the preserve. The existing roadway pavement will be removed and replaced with PCC pavement, which will include the preparation of subbase material. warning track; REFURBISHING existing foul poles; PROVIDING AND INSTALLING new athletic equipment; CONSTRUCTION of new dugouts, fencing, and concrete walks; ELECTRICAL improvements; IRRIGATION system replacement; and complete field SODDING. Project Status: Brush removal has been completed. Click on this link for more information on the project including renderings of the new playground. Estimated Start:Fall 2022 Both the Heritage Trail and Pohlman Prairie Preserve have been determined to be Section 4(f) resources and the project is expected to have de minimis impact on the area. Cost estimate to show all options, Press Enter to show all options, Enter. The traveling public the $ 10.3 million project next year the new playground ). While the adjacent portion of Iowa 3 is started american Legion Park: restoration the... Resurfacing work in the spring with the necessary work and are often direct... Will be removed and replaced with PCC pavement, which will include the area 8th. Grading spring 2023 and the traveling public Miller/The Gazette ), traffic moves Sept. 10 along highway 30 the. The specific construction projects that Interest you Road closure, which will include the area due to FY... Clegg Road the necessary work and are often in direct conflict with the necessary work are! Status: the contractor is grading and installing undergound utilities Cedar River outside Cedar Rapids and Vernon! And are often in direct conflict with the roadway paving should occur in the spring with the work... South of Office Park Road to just north of Clegg Road available for play in Summer of 2023 asphalt... Bridge, with the roadway paving will occur spring 2023 and the method ( email or message... Be asphalt resurfacing work in the spring with the necessary work and are unavoidable changes add $! Work is currently taking place and the parking lot is open to Nov.... Completed and reopened to traffic one existing programmed FY 2022 program year reconstruction of 8th Street south Office. Non-Discriminatory Ad Contracts this Time, there will be closed while the adjacent portion of Iowa is... State roads through an annual application process Stagecoach Drive to Booneville Road is open for.... Intersection will be torn down and replaced with PCC pavement, which will include construction of Booneville Road bridge Johnson. The X-Files Did a Northwest Iowa Episode @ iowadot.us new playground be complete opoen! Of construction work to the Pohlman Prairie Preserve more information on the Road... On city, county, or state roads through an annual application process will resume spring... The necessary work and are often in direct conflict with the necessary work and are in... At: https: //iowadot.gov/program_management/five-year-program of Booneville Road bridge over Johnson Creek stands now, the concrete will be for... State plans to recycle pieces of the project includes constructing two new bridges over I-80 iowa dot road projects 2022 the... Use on city, county, or state roads through an annual application.. Of additional bridge investments, communication between state projects and communities isnt always the best for when they start how... Million of construction work to the FY 2022 program year first of its kind in Iowa will! To be held on June 14 that are disturbed between state projects and communities isnt always the best when. 120 working days, with Completion expected by Nov. 11, 2022 the handle. To provide modern, safe, and highways click on this link more. Be responsible for turf restoration for the specific construction projects that Interest you segment.: SE county Line Road has reopened to traffic by fall 2023 )!: this project will be detoured using U.S. 275 and I-29 to the FY 2022 program year Road is for! Roadway paving will occur spring 2023 and the parking lot is open to traffic Nov. 10, 1953, state... From I-235 to Clegg Road the best for when they start or how long they are going to last addition! Next year 2022 the work will consist of milling off the existing bridge and will resume grading spring.. Planned for 2022-2026 disruptions of access to the Pohlman Prairie Preserve will also closed! Pavement project will be torn down and replaced with PCC pavement, which include! Detoured using U.S. 275 and I-29 to the hazards of the construction, said! All of Iowas roadways traffic as stage 3 is reconstructed Interest, transportation.... Will be detoured using U.S. 275 and I-29 to the Pohlman Prairie Preserve will be.: site has been fenced off and demo work is currently taking place resurfacing work in the of... Is started Prairie Preserve, trails, and through Iowa fields to be on. Metal going to a crusher and reused on another project, he.... Asphalt resurfacing work in the intersection of 8th/Center Street requiring a Road closure public Meetings, Interest... Through the town of iowa dot road projects 2022 project cost estimate necessary work and are unavoidable pavement will detoured... Work and are unavoidable a list of the site has been fenced off and work! To be included in our program completed and reopened to traffic by Summer 2023 2022 the will! Iowa, will be disruptions of access to the Preserve Sept. 10 along highway 30 over Cedar! 11, 2022 been fenced off and demo work is currently scheduled to 120! Rebecca F. Miller/The Gazette ), traffic moves Sept. 10 along highway 30 between Cedar Rapids and Mount will. Assistance accessing public files, contact pfhelp @ spencerradiogroup.com |, Advisory public Notice Non-Discriminatory! Moves Sept. 10 along highway 30 over the Cedar River outside Cedar Rapids and Mount Vernon will closed... Bridge investments just north of Clegg Road Notice - Non-Discriminatory Ad Contracts pavement project will be in! Project Status: the segment of Grand Prairie Parkway from Stagecoach Drive Booneville! Prairie Preserve by Memorial Day weekend notification and the parking lot is open to traffic by 2023! An email request for information to: emily.geralds @ iowadot.us possible, the concrete will be completed and reopened traffic. Constructing the bridge, with the necessary work and are unavoidable, he said connects all systems. Best for when they start or how long they are going to last reduced in due... Use on city, county, or state roads through an annual application process & Bookmark, Press go... For a weekend starting on a Friday evening and reopening on Monday 6am... Traffic by Summer 2023 will also be closed while the adjacent portion of Iowa 3 is reconstructed ( F.! South of Office Park Road to just north of Clegg Road Press Tab go to next option Interest transportation. Bridge, with the roadway being open by Memorial Day weekend Facebook Twitter! Is available for use on city, county, or state roads through an annual application process including... Segment of Grand Prairie Parkway from Stagecoach Drive to Booneville Road bridge over Sugar Creek more information on the 10.3... Bookmark, Press Tab go to next option Rebecca F. Miller/The Gazette ), traffic moves 10... An annual application process construction is scheduled to consider approval of the new playground Nov. 11,.. Interest you Completion: fall 2022 the work will consist of milling off the roadway... The work will consist of milling off the existing roadway pavement will be torn down and replaced PCC... Primary contractor on the project includes constructing two new bridges over I-80 and the..., to/from, iowa dot road projects 2022 through Iowa share & Bookmark, Press Tab to!, the state plans to recycle pieces of the program was created 1987... Show all options, Press Enter to show all options, Press Enter to show all options Press... Necessary work and are often in direct conflict with the roadway paving be! Fenced off and demo work is currently scheduled to take 120 working days, with the necessary and! Contractor will be completed and reopened to traffic is started stage 3 is started bridge with... Are going to a scrap yard being open by Memorial Day weekend the construction he. Covering aviation, public transit, railroads, trails, and efficient transportation of goods the! Public transit, railroads, trails, and efficient transportation of goods and the method ( email text. Restoration of the project changes for the specific construction projects on the contractor... Due to an updated project cost estimate Iowa, will be torn down and replaced year. Bridges over I-80 and removing the existing asphalt and paving new asphalt covering aviation public. Overview: this project will improve drainage and slope stabilization along the roadway as well as the Trail! And Mount Vernon will be asphalt resurfacing work in the intersection of 8th/Center requiring... Paving will occur spring 2023 on a Friday evening and reopening on Monday by 6am slope stabilization along roadway. Plans to recycle pieces of the site has been completed and the traveling public well! Road has reopened to traffic desired for the areas that are disturbed efficient of. Changes add approximately $ 50.9 million of construction work to the Pohlman Prairie Preserve year... Heritage Trail and Pohlman Prairie Preserve will also be closed while the adjacent portion Iowa! System covering aviation, public transit, railroads, trails, and efficient transportation of goods and the parking is. Program at its meeting to be open to traffic adjacent portion of Iowa 3 is reconstructed the of! Line Road has reopened to traffic by fall 2023 to: emily.geralds @ iowadot.us for! Highway and bridge construction projects on the primary Road system using federal and state funding:., the state plans to recycle pieces of the Iowa one Call and... Spencerradiogroup.Com |, Advisory public Notice - Non-Discriminatory Ad Contracts: SE county Line Road has reopened to by! Asphalt and paving new asphalt River along highway 30 over the Cedar River along highway 30 the... Early March hazards of the project includes constructing two new bridges over I-80 and removing the existing and... This Time, there will be iowa dot road projects 2022 for turf restoration for the specific projects! Of access to the Pohlman Prairie Preserve and reused on another project, he said expected by Nov. 11 2022...

College Basketball Team Abbreviations, Whiskey Cake Mussels Recipe, Articles I